The scope of this project included construction of a 33kv Transmission line which became the internal connection between the two halves of the Gullen Range Wind farm, near Bannister NSW.

The site was challenging as the team worked in area where they had to deal with snow showers and Sub Zero temperatures as well as high winds. Our staff safety was paramount and we worked with our onsite OHS officer to make sure the needs of the staff and the needs of the project were being met always.

This job was also in area that had highly varied terrain and required substantial earthworks during the construction phase.